EB I 74 over BNSF

0.73MI S of US 34 · County 095, Illinois · Built 2018 · 2 Lanes · 8,850 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
048010200000000
Year Built
2018
Length
98.8 m (324.1 ft)
Max Span
35.7 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
8,850
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.