EB I-74 over MAIN (FAU 6800)
GALESBURG INERCH · County 095, Illinois · Built 1963 · 2 Lanes · 9,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
40.946992, -90.333831
This bridge is in worse condition than 72.4% of bridges in County 095. The average bridge in Illinois is 0 years old; this one is 63 years old.
Nearby Bridges
WB I-74 over E. MAIN ST
Built 1963
WB I-74 over BNSF RR (004648T)
Built 1963
EB I-74 over BNSF RR (004648T)
Built 1963
N. SOANGETAHA RD over AT&SF RR (004647L)
Built 2013
KNOX ST over I-74
Built 1964
FARNHAM ST over AT&SF (004649A)
Built 1976
CH 7 over I-74
Built 1963
F-F STREET over COURT CREEK
Built 1994
LOSEY ST. GALESBUR over CEDAR CREEK
Built 1925
BRICKYARD RD (650 over I-74
Built 1963
Bridge Details
- Structure #
- 048000900000000
- Year Built
- 1963
- Length
- 54.3 m (178.1 ft)
- Max Span
- 15.5 m
- Width
- 12.7 m (41.7 ft)
- Lanes
- 2
- Daily Traffic
- 9,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $844,000
- Total Project Cost
- $1,266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.