EB I-74 over MAIN (FAU 6800)

GALESBURG INERCH · County 095, Illinois · Built 1963 · 2 Lanes · 9,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
048000900000000
Year Built
1963
Length
54.3 m (178.1 ft)
Max Span
15.5 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
9,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$844,000
Total Project Cost
$1,266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.