C.H. 2 (Grove Road over West Aux Sable Creek

1.5 MI N of US RTE 5 · County 093, Illinois · Built 2020 · 2 Lanes · 1,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
047317700000000
Year Built
2020
Length
44.5 m (146 ft)
Max Span
18.3 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
1,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.