US 30 over BLACKBERRY CREEK

0.1 M W OF ORCHARD · County 089, Illinois · Built 1956 · 2 Lanes · 15,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
047002900000000
Year Built
1956
Reconstructed
1991
Length
27.5 m (90.2 ft)
Max Span
13.2 m
Width
18 m (59.1 ft)
Lanes
2
Daily Traffic
15,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$416,000
Total Project Cost
$624,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.