CH 30 over ROCK CREEK

4 MI W MANTENO · County 091, Illinois · Built 1974 · 2 Lanes · 175 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
046332000000000
Year Built
1974
Reconstructed
2002
Length
37.1 m (121.7 ft)
Max Span
12.2 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
175
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.