CH 13 over PIKE CR

1.1 MI NE MOMENCE · County 091, Illinois · Built 1960 · 2 Lanes · 850 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
4
Poor
Superstructure
2
Critical
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 2 Critical
Substructure 6 Satisfactory

Location

41.179039, -87.632439

This bridge is in worse condition than 98.3% of bridges in County 091. The average bridge in Illinois is 0 years old; this one is 66 years old.

Nearby Bridges

Bridge Details

Structure #
046300800000000
Year Built
1960
Length
24.4 m (80.1 ft)
Max Span
9.1 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
850
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.