I-57 NB over RR & DrainageDitch

0.9 M N of IL 17 · County 091, Illinois · Built 2023 · 2 Lanes · 14,450 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
046015600000000
Year Built
2023
Length
61.7 m (202.4 ft)
Max Span
29.8 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
14,450
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.