IL 56 WB over IL 47

4 M S I-88 · County 089, Illinois · Built 1961 · 3 Lanes · 14,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
045003600000000
Year Built
1961
Reconstructed
1985
Length
63.9 m (209.6 ft)
Max Span
19.1 m
Width
14.5 m (47.6 ft)
Lanes
3
Daily Traffic
14,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$758,000
Total Project Cost
$1,137,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.