W. STAGECOACH TRAI over GALENA RIVER &CCP RR

.3 MI. E. OF GALENA · County 085, Illinois · Built 1999 · 2 Lanes · 2,150 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
043318400000000
Year Built
1999
Length
238.3 m (781.8 ft)
Max Span
36.6 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,150
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.