TOWNSHIP ROAD NO 8 over SNIPE HOLLOW BR

2 MI NW ELIZABETH · County 085, Illinois · Built 1920 · 1 Lanes · 350 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
043308300000000
Year Built
1920
Length
14.9 m (48.9 ft)
Max Span
14.3 m
Width
6.7 m (22 ft)
Lanes
1
Daily Traffic
350
Material
Concrete
Design
Other
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$95,000
Total Project Cost
$143,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.