TR 507 over HURRICANE CREEK

2 MI S SCHELLER · County 081, Illinois · Built 1998 · 2 Lanes · 75 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
041368300000000
Year Built
1998
Length
23.3 m (76.4 ft)
Max Span
7.6 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
75
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.