N. SATO ROAD-TR 12 over TRIB TO BEAUCOUP CR
2.3 MI N IL 4 · County 077, Illinois · Built 1999 · 2 Lanes · 75 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
37.922833, -89.430658
This bridge is in worse condition than 20.2% of bridges in County 077. The average bridge in Illinois is 0 years old; this one is 27 years old.
Nearby Bridges
CH 8-BEAUCOUP RD over TRIB-RATTLESNAKE CR
Built 2002
TR 122 over CREEK
Built 1985
SUGAR HILL RD-CH 2 over CREEK
Built 1999
CH 2 over CREEK
Built 2005
TR 160 over TRIB RATTLESNAKE CK
Built 1992
TR 110 over RATTLESNAKE CRK TRIB
Built 2006
TR 305A over PIPESTONE CREEK
Built 1980
TR 305A over GALUM CREEK
Built 1977
TR 95 over RATTLESNAKE CREEK
Built 1986
FAS 1916-MUDLINE R over RATTLESNAKE CR TRIB
Built 1998
Bridge Details
- Structure #
- 039323200000000
- Year Built
- 1999
- Length
- 18.8 m (61.7 ft)
- Max Span
- 18 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 75
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.