FAP 322-US 51 over BIG MUDDY RIVER

1.8 MI S DESOTO · County 077, Illinois · Built 2001 · 2 Lanes · 6,250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
039006500000000
Year Built
2001
Length
111 m (364.2 ft)
Max Span
45 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
6,250
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.