TR 396 over TRIB TO SUGAR CR
.25 MI W STOCKLAND · County 075, Illinois · Built 1907 · 1 Lanes · 50 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
40.614325, -87.596364
This bridge is in worse condition than 94.9% of bridges in County 075. The average bridge in Illinois is 0 years old; this one is 119 years old.
Nearby Bridges
CH 9/FAS 334 over TRIB OF SUGAR CREEK
Built 1997
TR 380A over TRIB OF SUGAR CREEK
Built 1990
TR 380 A over SUGAR CREEK
Built 1988
FAS 1343 CH 41 over BRANCH SUGAR CREEK
Built 1959
Stockland Road over SUGAR CREEK
Built 1994
TR 366 over TRIB SUGAR CREEK
Built 1980
FAS 334 CH 9 over TRIB SUGARCREEK
Built 1975
TR 317 over UNNAMED TRIBUTARY
Built 1995
TR 285 over TRIB TO SUGAR CREEK
Built 1983
TR 331A over STREAM
Built 1976
Bridge Details
- Structure #
- 038552800000000
- Year Built
- 1907
- Length
- 15.2 m (49.9 ft)
- Max Span
- 14.3 m
- Width
- 6.2 m (20.3 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Other
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $54,000
- Total Project Cost
- $81,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.