CH 42 over TRIB SPRING CREEK

2.1 MI N US 24 · County 075, Illinois · Built 1972 · 2 Lanes · 75 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
038390800000000
Year Built
1972
Length
20.7 m (67.9 ft)
Max Span
6.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
75
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.