TR 2 D over STREAM

0.2 Mi S of CR1400S · County 075, Illinois · Built 1953 · 2 Lanes · 75 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
038374300000000
Year Built
1953
Length
7.3 m (24 ft)
Max Span
6.9 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
75
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Private (other than railroad)
Last Inspected
N/A
Est. Improvement
$46,000
Total Project Cost
$69,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.