IL 1/FAP 332A over COON CREEK

5.35 M S OF US 24 · County 075, Illinois · Built 2022 · 2 Lanes · 2,450 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 8 Very Good

Location

40.700317, -87.684125

This bridge is in worse condition than 20.6% of bridges in County 075. The average bridge in Illinois is 0 years old; this one is 4 years old.

Nearby Bridges

Bridge Details

Structure #
038020900000000
Year Built
2022
Length
32.4 m (106.3 ft)
Max Span
31.3 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
2,450
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.