FAS 2224 over BNSF RR
SOUTH OF ORION · County 073, Illinois · Built 1930 · 2 Lanes · 550 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
41.341997, -90.376961
This bridge is in worse condition than 72.6% of bridges in County 073. The average bridge in Illinois is 0 years old; this one is 96 years old.
Nearby Bridges
US 150 over UNNAMED STREAM
Built 1995
TR 265 over BR OF CAMP CREEK
Built 1986
FAI 74 NB over OSCO-ORION RD/FS2224
Built 1965
FAI 74 SB over OSCO-ORION RD/FS2224
Built 1965
TR 201(1550 N) over BNSF RR
Built 1945
I 74 over CAMP CREEK
Built 1966
TR 225 over CREEK
Built 2009
TR 251 over FAI 74
Built 1966
US 150 over CAMP CREEK
Built 2000
TR 46 over CAMP CREEK
Built 1965
Bridge Details
- Structure #
- 037991000000000
- Year Built
- 1930
- Length
- 62.5 m (205.1 ft)
- Max Span
- 9.1 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 550
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $597,000
- Total Project Cost
- $896,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.