CH 19 over HILLERY CREEK
3 MI S CAMBRIDGE · County 073, Illinois · Built 2024 · 2 Lanes · 325 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
41.251028, -90.188417
This bridge is in worse condition than 12.8% of bridges in County 073. The average bridge in Illinois is 0 years old; this one is 2 years old.
Nearby Bridges
IL 82 over HILLERY CREEK
Built 1994
IL 82 over N. BR. EDWARDS RIVER
Built 1989
TR 152 over EDWARDS RIVER
Built 1978
TR 180 over EDWARD RIVER
Built 1982
TR 130 over EDWARDS RIVER
Built 1924
ULAH ROAD (CH 21) over DRAINAGE DITCH
Built 1995
TR 345 B over S. EDWARDS RIVER
Built 1980
TR 317 over S. EDWARDS RIVER
Built 1997
TR 289 over BRANCH EDWARDS RIVER
Built 1988
ULAH ROAD over EDWARDS RIVER
Built 1933
Bridge Details
- Structure #
- 037338500000000
- Year Built
- 2024
- Length
- 24.4 m (80.1 ft)
- Max Span
- 23.6 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 325
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.