TR 407 over Spoon Creek
1 MI SW OF GALVA · County 073, Illinois · Built 2012 · 2 Lanes · 100 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.156617, -90.064803
This bridge is in worse condition than 13.7% of bridges in County 073. The average bridge in Illinois is 0 years old; this one is 14 years old.
Nearby Bridges
TR 278 over STREAM
Built 1984
TR 15 over MUD RUN CREEK
Built 1984
TR 288 over SOUTH EDWARDS RIVER
Built 1968
TR 391(200 N) over SPOONER CREEK
Built 1988
CH 5 FAS 236 over S EDWARDS RIVER
Built 1977
TR 266 over SOUTH EDWARDS RIVER
Built 1977
FAS-393(CH-4) over Trib to Walnut Creek
Built 1983
TR 278 over WALNUT CREEK TRIB
Built 2015
TR 391 over BR. OF S. EDWARDS
Built 2003
TR 254 over MUD RUN CREEK
Built 1983
Bridge Details
- Structure #
- 037337000000000
- Year Built
- 2012
- Length
- 14.2 m (46.6 ft)
- Max Span
- 13.4 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.