TR 194 over BR OF SPRING CREEK

3.5 MI NE CAMBRIDGE · County 073, Illinois · Built 1930 · 2 Lanes · 50 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
037310800000000
Year Built
1930
Length
8.5 m (27.9 ft)
Max Span
8.2 m
Width
5.8 m (19 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$26,000
Total Project Cost
$39,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.