TR 172 over FAI 80

1.0 MI W OF GENESEO · County 073, Illinois · Built 1961 · 2 Lanes · 300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
037011100000000
Year Built
1961
Length
69.5 m (228 ft)
Max Span
20.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
300
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$135,000
Total Project Cost
$162,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.