FAI 80 SB over MINERAL CREEK

0.7 MI N JCT US 6 · County 073, Illinois · Built 1965 · 2 Lanes · 10,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
037002900000000
Year Built
1965
Reconstructed
1990
Length
52.4 m (171.9 ft)
Max Span
25.6 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
10,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.