CH 9 (RARITAN ROAD over HONEY CR

W EDGE OF RARITAN · County 071, Illinois · Built 1956 · 2 Lanes · 725 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
036001900000000
Year Built
1956
Reconstructed
2004
Length
34.4 m (112.9 ft)
Max Span
11.9 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
725
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$310,000
Total Project Cost
$462,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.