TR 46 over LARRY CREEK

6.0 S NAUVOO · County 067, Illinois · Built 1969 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
034550600000000
Year Built
1969
Length
15.2 m (49.9 ft)
Max Span
14.6 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.