TR 239A over MIDDLE CREEK

1.80 mi E IL 336 · County 067, Illinois · Built 1917 · 1 Lanes · 50 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
034441000000000
Year Built
1917
Length
8.5 m (27.9 ft)
Max Span
7.9 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
50
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$43,000
Total Project Cost
$65,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.