TR 7 over CAMP CREEK

2.5 SE DALLAS CITY · County 067, Illinois · Built 1962 · 2 Lanes · 100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
034411000000000
Year Built
1962
Length
40.8 m (133.9 ft)
Max Span
13.7 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$161,000
Total Project Cost
$242,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.