TR 136 over Trib To Bear Creek

0.97 mi S of CH 11 · County 067, Illinois · Built 2018 · 2 Lanes · 75 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
034370700000000
Year Built
2018
Length
21 m (68.9 ft)
Max Span
20.1 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
75
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.