CH-23 over BEAR CREEK

4.4M W OF WEST POINT · County 067, Illinois · Built 2006 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
034323100000000
Year Built
2006
Length
128 m (419.9 ft)
Max Span
27.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.