IL 96 FAP 506 over RAILROAD CR

.4 M S HAMILTON · County 067, Illinois · Built 2011 · 2 Lanes · 2,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
034052200000000
Year Built
2011
Length
35.1 m (115.2 ft)
Max Span
34.1 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
2,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.