IL 47 FAP 326 over W FORK MAZON RIVER

6.1 MI N OF I-55 · County 063, Illinois · Built 2009 · 2 Lanes · 4,550 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
032011600000000
Year Built
2009
Length
42.7 m (140.1 ft)
Max Span
21.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
4,550
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.