ILL 53 FAP 846 over MAZON RIVER
1.3 M N OF GARDNER · County 063, Illinois · Built 1969 · 2 Lanes · 1,400 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
41.205989, -88.284067
This bridge is in worse condition than 55.2% of bridges in County 063. The average bridge in Illinois is 0 years old; this one is 57 years old.
Nearby Bridges
FAI 55 NB over MAZON RIVER @ TR 125
Built 1955
FAI 55 SB over MAZON RIVER @ TR 125
Built 1955
TR 182 over FAI 55
Built 1993
CARBON HILL RD CH3 over EAST FK MAZON RIVER
Built 1977
FAI 55 NB over Union Pacific RR
Built 1955
FAI 55 SB over Union Pacific RR
Built 1955
FAS 272 over FAI 55
Built 1994
ILL 53 over UNION PACIFIC RR
Built 2000
HOWLAND RD/MS 2020 over TRIB E FK MAZON RIV
Built 1983
FAS 292/GARDNER RD over I 55
Built 1997
Bridge Details
- Structure #
- 032002300000000
- Year Built
- 1969
- Length
- 61.1 m (200.5 ft)
- Max Span
- 16.2 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,400
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $552,000
- Total Project Cost
- $828,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.