TR 163A over Apple Creek

1.7 Mi SE Haypress · County 061, Illinois · Built 2018 · 2 Lanes · 25 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
031526300000000
Year Built
2018
Reconstructed
2020
Length
36.2 m (118.8 ft)
Max Span
17.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
25
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.