ILL 97 over TRIB BIG CREEK

3.5 MI S OF CUBA · County 057, Illinois · Built 1928 · 2 Lanes · 1,450 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
029002600000000
Year Built
1928
Reconstructed
1978
Length
9.8 m (32.2 ft)
Max Span
9.1 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
1,450
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.