US 24 over BNSF RR (063690C)
1 MI E OF SCHUYLER C · County 057, Illinois · Built 1954 · 2 Lanes · 1,350 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
40.205956, -90.436503
This bridge is in worse condition than 58.4% of bridges in County 057. The average bridge in Illinois is 0 years old; this one is 72 years old.
Nearby Bridges
SULLIVAN RD - TR 2 over GAINES BRANCH
Built 1953
US 24 over SUGAR CR
Built 2005
TR 165 over BN RR
Built 1983
FAS 2584 over SOUTH BR SUGAR CR.
Built 1995
TR 308 over SUGAR CREEK
Built 1989
TR-165 over SUGAR CRK
Built 1997
TR 167 over HARRIS BR. SUGAR CR.
Built 1978
TR 350 over HARRIS BRNCH
Built 1900
TR 302 over RICHIE BR CR
Built 1981
TR 83A over RICHIE BR. CRK.
Built 1995
Bridge Details
- Structure #
- 029000700000000
- Year Built
- 1954
- Reconstructed
- 2001
- Length
- 79.9 m (262.1 ft)
- Max Span
- 26.2 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,350
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $583,000
- Total Project Cost
- $875,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.