TR 222 over POND CREEK

1 MI S W. FRANKFORT · County 055, Illinois · Built 1979 · 2 Lanes · 725 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
028321200000000
Year Built
1979
Length
12.8 m (42 ft)
Max Span
12.5 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
725
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.