I 57 SB over M. FORK BIG MUDDY RIVER

1.5 MI N W FRANKFORT · County 055, Illinois · Built 2024 · 3 Lanes · 18,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
028008800000000
Year Built
2024
Length
109 m (357.6 ft)
Max Span
40.8 m
Width
19.4 m (63.6 ft)
Lanes
3
Daily Traffic
18,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.