WEBSTER ST-WEST CI over I-57 & RAMPS
IN WEST CITY · County 055, Illinois · Built 1964 · 2 Lanes · 1,150 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
37.994092, -88.935383
This bridge is in worse condition than 88.7% of bridges in County 055. The average bridge in Illinois is 0 years old; this one is 62 years old.
Nearby Bridges
ILL 14 over INTERSTATE 57
Built 1964
BENTON FIELD RD over DRAINAGE DITCH
Built 2008
INTERSTATE 57 NB over UP RR
Built 2013
INTERSTATE 57 SB over UP RR
Built 2013
I 57 over TR 213 LINN RD
Built 1962
DUQUOIN ST - BENTO over INTERSTATE 57
Built 1963
TR 209-ST JOSEPH R over TRIB-BIG MUDDY RIVER
Built 2001
LINN RD over TRIB TO BIG MUDDY
Built 2010
TR 164B over BRANCH BIG MUDDY RV
Built 1989
FAU 9452 over SUGAR CREEK
Built 1964
Bridge Details
- Structure #
- 028006300000000
- Year Built
- 1964
- Length
- 86.9 m (285.1 ft)
- Max Span
- 24.1 m
- Width
- 10.9 m (35.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,150
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $204,000
- Total Project Cost
- $245,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.