CH 26 STEVES RD over THE BIG FOUR
360N 1500E · County 053, Illinois · Built 1966 · 2 Lanes · 250 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
40.453392, -88.174764
This bridge is in worse condition than 92.4% of bridges in County 053. The average bridge in Illinois is 0 years old; this one is 60 years old.
Nearby Bridges
ILL 9 over WALL TOWN DR. DITCH
Built 2005
ILL 9 over BIG FOUR DITCH
Built 1975
TR 60C PATTON over THE BIG FOUR
Built 1967
TR 99A PATTON over STREAM
Built 1984
TR 91 PATTON over WALL TOWN DR DITCH
Built 1974
ILL 9 over DRAINAGE DITCH
Built 1973
TR 105A PATTON over STREAM
Built 1982
TR 60C PATTON over STREAM
Built 1980
CH 26 STEVES RD over TRIB BIG FOUR DITCH
Built 2009
TR 91 PATTON over THE BIG FOUR
Built 1975
Bridge Details
- Structure #
- 027303400000000
- Year Built
- 1966
- Length
- 32.6 m (107 ft)
- Max Span
- 15.2 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 250
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $147,000
- Total Project Cost
- $221,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.