CLARENCE RD FAS 5 over SUGAR CREEK
240N 2600E · County 053, Illinois · Built 1959 · 2 Lanes · 250 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
3
Serious
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 3 | Serious |
| Substructure | 6 | Satisfactory |
Location
40.432711, -87.970375
This bridge is in worse condition than 97% of bridges in County 053. The average bridge in Illinois is 0 years old; this one is 67 years old.
Nearby Bridges
TR 103 BUTTON over SUGAR CREEK
Built 1983
TR 92 BUTTON over SUGAR CREEK
Built 1993
TR-88 over Stream
Built 2017
ILL 9 over SUGAR CREEK
Built 1997
TR 115 BUTTON over STREAM
Built 1994
TR 88 BUTTON over STREAM
Built 1978
FAS 515 BASE LINE over STREAM
Built 2007
TR 88 BUTTON over STREAM
Built 2019
TR 3 A over STREAM
Built 1977
TR 2 over BR SUGAR CREEK
Built 2010
Bridge Details
- Structure #
- 027302400000000
- Year Built
- 1959
- Length
- 18.6 m (61 ft)
- Max Span
- 5.8 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 250
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.