ECHOF STREET 3250 over CREEK

FARINA · County 051, Illinois · Built 1909 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
026600000000000
Year Built
1909
Length
7.9 m (25.9 ft)
Max Span
7.3 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
50
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$49,000
Total Project Cost
$74,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.