CH-3 over SOUTH FORK CREEK

5 MI N AVENA · County 051, Illinois · Built 1982 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

39.076372, -88.918231

This bridge is in worse condition than 14% of bridges in County 051. The average bridge in Illinois is 0 years old; this one is 44 years old.

Nearby Bridges

Bridge Details

Structure #
026332000000000
Year Built
1982
Length
37.5 m (123 ft)
Max Span
11.9 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.