TR-511 over TRIB LONE GROVE BR

1 MI N ST PETER · County 051, Illinois · Built 1935 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
026323200000000
Year Built
1935
Length
13.4 m (44 ft)
Max Span
8.5 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
50
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$100,000
Total Project Cost
$170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.