FAS-1712 (CH-16) over BISHOP CREEK
3 MI W DIETRICH · County 049, Illinois · Built 2022 · 2 Lanes · 775 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
39.060431, -88.443867
This bridge is in worse condition than 17.3% of bridges in County 049. The average bridge in Illinois is 0 years old; this one is 4 years old.
Nearby Bridges
TR-302 over BISHOP CREEK
Built 1978
TR-302 over BRANCH BISHOP CREEK
Built 1979
CH-13 PUMPING STA over BISHOP CREEK
Built 1993
TR-294 over SALT CREEK
Built 2002
FAS-709 (CH-19) over LITTLE SALT CREEK
Built 1939
FAP-95 (ILL 33) over BISHOP CREEK
Built 2007
FAP-95 (ILL-33) over LITTLE SALT CREEK
Built 1977
TR 139 over BISHOP CREEK
Built 2005
TR 302 2100th stre over DIETERICH CREEK
Built 2021
FAS-709 (CH-19) over BISHOP CREEK
Built 1939
Bridge Details
- Structure #
- 025333400000000
- Year Built
- 2022
- Length
- 30.4 m (99.7 ft)
- Max Span
- 12.8 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 775
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.