CH-9 over GREEN CREEK

3 MI N EFFINGHAM · County 049, Illinois · Built 1977 · 2 Lanes · 600 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
025320400000000
Year Built
1977
Length
45.7 m (149.9 ft)
Max Span
11 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
600
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.