TR-220 over E BR GREEN CREEK

0.75 MI S ST MARYS · County 049, Illinois · Built 2001 · 2 Lanes · 500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
025319000000000
Year Built
2001
Length
24.4 m (80.1 ft)
Max Span
24.4 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.