FAS-1706 (CH-6) over LAKE SARA
3 MI SE SHUMWAY · County 049, Illinois · Built 1958 · 2 Lanes · 1,500 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
39.149539, -88.645547
This bridge is in worse condition than 33.9% of bridges in County 049. The average bridge in Illinois is 0 years old; this one is 68 years old.
Nearby Bridges
TR-77A over LAKE SARA SPILLWAY
Built 1957
FAP-766 (ILL-32) over STREAM
Built 1932
TR-89 over LILY CREEK
Built 1989
TR 115 over LILY CREEK
Built 2003
FAP-774 (ILL-32 33 over LITTLE WABASH RIVER
Built 1974
FAU 8390 over LITTLE WABASH RIVER
Built 2000
TR 160 over GREEN CREEK
Built 2006
FAP-774 (ILL-32 33 over L WABASH RV OVERFLOW
Built 1974
FAP-774 (ILL-33) over MORRIS CREEK
Built 1939
TR-85B over LITTLE WABASH RIVER
Built 1995
Bridge Details
- Structure #
- 025301300000000
- Year Built
- 1958
- Reconstructed
- 2020
- Length
- 18.9 m (62 ft)
- Max Span
- 5.8 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,500
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $222,000
- Total Project Cost
- $259,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.