FAS-711 (CH 25) over FULFER CREEK

6 MI S ALTAMONT · County 049, Illinois · Built 1938 · 2 Lanes · 1,350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
025301200000000
Year Built
1938
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
1,350
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.