TR-78 over FAI-70

5.5 MI E ALTAMNT INT · County 049, Illinois · Built 1961 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
025005900000000
Year Built
1961
Length
72.8 m (238.8 ft)
Max Span
22.3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$852,000
Total Project Cost
$994,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.