FAI-70/RMP-1285 over FAI-57 SB

TRI-LEVEL SW EFFINGH · County 049, Illinois · Built 1960 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
025001800000000
Year Built
1960
Reconstructed
1992
Length
87.1 m (285.8 ft)
Max Span
18.9 m
Width
7.8 m (25.6 ft)
Lanes
1
Daily Traffic
50
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.